1/15/2020
Critical Lift at Linde
Contributed by Paul Creedon
Paul Creedon, Project Manager for the Heavy Industrial & Generation Group shared this message. “The foundation anchor bolt layout and installation was done with such precision by our Civil group that the drum touched down perfectly. Tom Conway, Civil PM, left the Mechanical group with a flawless footprint to land all of our major Equipment with ease. Joe Ciferni and his gang did a great job planning for and executing this major milestone lift today; done SAFELY and efficiently.”
Tail Gas Drum
111’ Height
13’Diameter
135,000 lbs
Two Crane Critical Lift Tailing & Setting Operation.
Main Crane#1: 300t Crawler
Tailing Crane#2: 500t AT
*This article is intended for internal use only. May not be distributed externally or used for external distribution as this may contain privileged or confidential information for Riggs Distler Employees only.*